
INSTALLATIONand OPERATINGINSTRUCTIONSROOF MOUNTAIR CONDITIONERRotary XL (558 Series)and Classic (548 Series)QUICK START SHUR STARTMODELS MODELS54812.0
SPECIFICATIONS * For two units USE 5000 watt generatorDUO-THERM TESTED UNDER ARI STANDARD 250-74UL STANDARD 484 . CSA STANDARD 22.2 No. 0,46 and 11
INSTALLATION LAYOUTFig. 4AIR CONDITIONINGUNITNOTE: The anchor bolts, supplied as standardequipment, will cover a range of 2 3/8" to 4 1/8"r
2.4.6.Framing is required to provide adequate support and asmooth surface for sealing. Under no circumstances shouldthe roof be constructed to create
8.9.10.Control Box Installation: Fasten the control box to the 11.Install Air Box: (Reference Fig. 7) Mounting requiresceiling template with two blunt
12. FOR COOLED AND DEHUMIDIFIED AIR set the thermo-stat dial to the desired temperature. The warmest setting(WARM) on the dial is approximately 95 deg
WIRING DIAGRAMCOMPRESSORII FACTORY WIRING GRN WHT FIELD WIRINGBLK115 V.A.C. 60~ IfSHUR START ONLY CIRCUIT DIAGRAMFANCAPGRD.Therm.
DUO-THERM, Division of Motor Wheel Corp., LaGrange, Indiana 46761
Comentários a estes Manuais